Boultham Park fish refuge project saw the design, build an installation of 14 fish refuges along a 100 metre stretch of The River Witham. The structures are made
Chapel Hill Fish Refuge on the River Witham had become extremely overgrown. The Environment Agency asked us to clear the overgrown bank and berms to restore the diversity
A sunny September allowed us to start and complete an in-stream berm installation project at Dysart Park in Grantham. This particular area of The River Witham was a straight channel